Agroinvest Ludinovo
Smart engineering systems:
Automation implemented:
1. Power supply and lighting of the production block and power center buildings:
Equipment installed:
Main distribution boards: 1
Automatic transfer switches (ATS): 2
Lighting panels: 18
Light fixtures: 724
2. Automation of building services in the production block and power center:
General ventilation and air conditioning (HVAC), including:
General ventilation supply and exhaust air handling units
Entrance air curtains
Fire dampers
Individual heating substation
Automated equipment:
1) general ventilation and air conditioning:
Supply air systems: 18
Exhaust systems: 50
Air curtains: 8
3. Structured cabling system (low-current):
Equipment installed:
LAN ports: 264
Video cameras: 94
Access control points: 49
Telecom cabinets: 29
4. Automatic fire alarm system of the production block and power center buildings:
Equipment installed:
-
DIP-34A smoke detectors: 243
IPDL-52M linear beam detectors: 24
S2000M control and monitoring panel: 2
S2000-KDL two-wire loop controller: 8
S2000-KPB control and actuation unit: 18
S2000-ASPT powder, aerosol or gas extinguishing control units: 5
Tungus powder extinguishing modules: 37
Lavina-100-8 powder extinguishing modules: 12
5. Installation of a 4,000 A main busway and neutral grounding of two auxiliary transformers.